HUAWEI RTN 950 MANUAL PDF

OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei provides technical support resources for OptiX RTN Series Transmission Network. Access product manuals, HedEx documents, and visio stencils. Huawei provides technical support resources for OptiX RTN A Series Transmission Network. Access product manuals, HedEx documents, and visio stencils.

Author: Arashirn Zulugami
Country: Iceland
Language: English (Spanish)
Genre: Automotive
Published (Last): 23 May 2015
Pages: 395
PDF File Size: 19.9 Mb
ePub File Size: 3.10 Mb
ISBN: 434-3-43675-309-2
Downloads: 68396
Price: Free* [*Free Regsitration Required]
Uploader: Makazahn

In Direction, select Local To Remote. Boldface Names of files, directories, folders, and users are in boldface.

In case nuawei a severe situation, the person must be sent to a hospital immediately. The remote end selects signals from the two received signals. Step 9 Release the inloop set in Step 2.

After manua parameter rttn set, the NE automatically enables the antenna misalignment indicating function. After you finish one field, press Enter to enter the next field. As a result, services will fail to run properly.

The system starts delivering the configuration. Power on the standby ODU at the local end. When a beam of light enters eyes, the eyes may be damaged. Several adjustments are required so that the three signal peaks of line AA’ can appear.

In this case, protection group alarms are reported to indicate radio link faults. This is to adapt the traffic to network resources that can be provided by the downstream router to avoid packet discarding and congestion. One item is selected. The LSR is composed of two parts: Login to an NE Multiple Spanning Multiple spanning tree protocol. It is located in layer 2 of the IP protocol stack. Step 5 Use the BER tester to test the bit errors. The channel can be established through wire, radio microwavefiber or a combination of the three.

Then, an alarm panel prompts and the user can view the details of the alarm.

  GEOGRAPHICA STRABO PDF

Obtain the received signal level in the horizontal polarization direction P1 and the received signal level in the vertical polarization direction P2 based on the curve delivered in the ODU carton. Specifically, if the electric field vector of the electromagnetic wave is perpendicular to the plane of horizon, this electromagnetic wave is called vertically polarized wave; if the electric field vector of the electromagnetic wave is parallel to the plane of horizon, this electromagnetic wave is called horizontal polarized wave; if the tip of the electric field vector, at a fixed point in space, describes a circle, this electromagnetic wave is called circularly polarized wave.

The MSTP can be used in a loop network. It manuao preferred to use isoamylol. Operating an electronic device in an environment of flammable gas causes a severe hazard. These two parameters must be set to different values, but Link ID-V must be set to the same value at both ends of a link and Link ID-H must also be set huasei the same value at both ends of a hauwei.

Grounding Requirements The grounding requirements are applicable to the device that needs to manua, grounded. Engineers are certified to commission the antennas.

This dBm parameter cannot be set to a value that exceeds the nominal power rang of the ODU in the guaranteed capacity modulation module.

Step by Step Login RTN 950 HUAWEI

This protocol manages and controls the multicast group by listening to and analyze the Internet Group Management Protocol IGMP packet between hosts and layer 3 devices. The packet carries two layers of tags to travel through the backbone network of the carrier.

Figure shows the connection. The major commissioning steps are as follows: The Result dialog box displays that the test is successful. Off Indicates a power failure. Tools, Equipment, and Materials None. When transmitting data, the MAC protocol checks whether to be able to transmit data.

  CHALAWA NOVEL PDF

Step 2 Remove or install the IF jumper. This allows Internet and other IP-based network service providers to offer different levels of service to customers.

Download RTN Commissioning (Web LCT)

The protocol that introduces the mapping between VLANs and multiple spanning trees. This example does not provide the planning information except for the polarization direction that is not related to the IDU configuration. Step 11 Adjust the feed boom at the local end, and ensure that the RSL of the vertically polarized signals reaches the lower threshold P6. This parameter is set according to the network plan. The Search NE dialog box is displayed. In this case, the orderwire point-to-multipoint group call changes to a point-to-point call between two NEs.

OptiX RTN Radio Transmission System Commissioning Guide U B Glossary graphical user interface A visual computer environment that represents programs, files, and options with graphical images, such as icons, menus, and dialog boxes, on the screen.

The operation is performed only when the status of the protection tunnel is normal. Compared with the method of manually creating NEs, this method is faster and more reliable. All diagrams share the bandwidth of the network and routers.

This parameter is available only if the E1 priority function None is enabled for the ports configured in the cross-connections. One item is selected or no item is selected. Step 4 Power off the vertically polarized ODUs at both ends of the radio link, and power on the horizontally polarized ODUs at both ends of the radio link. Therefore, service switching is realized.