BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 3 PDF

Summer Training Presentation of BHEL Block Limited Ranipur, Haridwar ( Uttrakhand) Submitted To: Mr. XYZ Submitted By: ABC Roll No. Who give me lot of inspiration and skills to complete this Report successfully. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. .. 34 CONCLUSION We have undertaken summer training in Bharat Heavy Electricals Limited, Haridwar. View Test Prep – from MECHANICAL I thankfully acknowledge the staff of BHEL, Haridwar for giving me so much co- (Sr. Manager,TUM Block-3) to support me during my Industrial Training. . I cannot even describe how much Course Hero helped me this summer.

Author: Zulugor Dougal
Country: Uganda
Language: English (Spanish)
Genre: Technology
Published (Last): 11 September 2018
Pages: 143
PDF File Size: 8.69 Mb
ePub File Size: 5.5 Mb
ISBN: 140-1-63897-188-4
Downloads: 61494
Price: Free* [*Free Regsitration Required]
Uploader: Dout

The length of the resistance thermometer depends upon the length of armature.

It progressed rapidly and three more factories went into production in Shells to be lined with tin based babbitt metal. Bearing housings and its shells to be of glock construction. Erection commissioning, operation and maintenance service vi.

P steam turbine is larger than H. Bhel Haridwar training ppt Download Report. The slot lower bars and slot upper are displaced from each other by one winding pitch and connected together by bus bars inside the stator frame in conformity with the connection diagram. Stator winding is done by placing stator on rotating installation.

Insulation life endurance test assessment facility. The conductors are made of hard drawn silver bearing copper. It is suitably ribbed with annular rings in inner walls to ensure high rigidity and strength and it also help to reduce vibration and to withstand the gas thermal pressure. The press ring is bolted to the ends of core bars. The number of layers or thickness of insulation depends on the machine voltage.

  MAC EL MICROBIO DESCONOCIDO PDF

The complete frame is subjected to hydraulic test at a pressure of 7 atm. Rotor inside the stator at standstill.

A feedback path is given to this system which compares theoretical value to predetermine and then it sends the current to rotor as per requirement. The coil are wound that two poles are obtained. The blades of fan have threaded roots su,mer screwed into the rotor shaft. Continuous circulation of gas inside the machine through a drier in order to remove any water vapor that may be present in it 5.

Training Report on Manufacturing of Turbo Generator at BHEL Haridwar | Hitesh Gupta –

Christmas tree and Well head assembled. The company has been earning profits continuously since 72 and paying dividends since which is a reflection of company’s commendable performance throughout. Each blade is screwed at its bhdl with a threaded pin.

Battery powered road vehicles are also manufactured by the company. HVDC transmission bheel iii. Test procedure for measurement of leakage reactance of TG stator winding — SCOPE — This procedure covers the leakage reactance measurement of stator winding after completion of winding. AC voltmeter75, 3.

Modernization and rehabilitation of power stations. They are employed with guide vans on inner side for ensuring uniform distribution of air or gas.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

Solar cellsHraining lanterns chargersSolar clocks. Vacuum pressed impregnated mica elastic high voltage insulation: Respect for dignity and potential of individuals.

The core business of HEEP includes design and manufacture of large size steam and gas turbines, turbo generators, heat exchangers, condensers and auxiliaries. Alternate arrangement hollow and solid conductors ensure an optimum solution for increasing current and to reduce losses. BHEL is the only company in India with the capability to make simulators for power plants, defense and other application 1.

  DISPOSABLE HEROES URRAH PDF

This procedure is for high voltage test on hzridwar winding of turbo generator. To compute potier reactance Xd. Control Relay Panels iv.

The company has been earning profits continuously since and paying dividend since Retaining rings are made u of non-magnetic high strength steeling order to reduce the stray losses. Log Bhwl Sign Up. The armature is connected to rotating rectifier brides for rectifying AC voltage induced to armature to DC voltage.

Generator is to be loaded within a very short period. This sequence is repeated as the steam passes through additional rows of fixed and moving blades. Erection commissioning, operation and maintenance services. For this purpose DM water of proper specifying resistance is selected. Simulator, Telecommunication systemOther advanced micro —processor based control system. About project SlidePlayer Terms of Service. Inner and sidewalls are suitably blanked to house for longitudinal hydrogen gas coolers inside the stator body.

AC ammeter ampere 4. Share buttons are harudwar little bit lower. The stator is cooled in this system by circulating demineralized water trough hollow conductors. BHEL as a part of Pt. The electro hydraulic converter then operates servomotor by hydraulic means to control steam flow rate. Electrics for Rolling Stock xi.